Menu
Deliverables
WPT2: Composability, Predictability & dependability
Work package leader: Nur Engin (NXP-NL)WPT3: Resource management
Work package leader: Nicolas Ventroux (CEA list)WPT4: Power-aware Architecture - Modeling, Estimation, and Optimization
Work package leader: Eugenio Villar (UCA)- DT4.2.2: Final report on architecture modeling, status: final (pdf format)
- DT4.3.6: Guidelines for system level design integration and optimization, including software, hardware platform and hardware-dependent-software optimization and integration, status: final (pdf format)
- DT4.5.4: Validation of MPSoC with autonomous peripherals and wireless sensor node ASIPs, status: final (pdf format)
WPT5: Reference Platforms
Work package leader: Fabio Scalise (ST-IT)- DT5.2: Commonalities between the demonstrators architecture and long term recommendations, status: due in M27
WPA1: Communication Infrastructure
Work package leader: Pal Varga (AITIA)- DA1.5: Final report on framework integrating methods and tools from the WPTs, status: final (pdf format)
- DA1.6: Performance and power simulation results of SW running on demonstrators, status: due in M27
- DA1.7: Requirements for future SW optimized HW, status: due in M27
WPA2: Surveillance Systems
Work package leader: Mario Vigliar (DPControl)- DA2.2: Final specification release, status: final (pdf format)
- DA2.3a: Demonstrators for TA2.3 and final report on performance evaluation for the image pipeline, status: due in M24 delayed until M27
- DA2.3b: Demonstrators for TA2.3 and TA2.4 and final report on performance evaluation for smart video processing, status: due in M27
WPA3: Smart Mobile Terminals
Work package leader: Anne-Marie Fouilliart (Thales)- DA3.3: Demonstrator report, status: due in M27 (pdf format)
WPA4: Stationary Video Applications
Work package leader: Augustin Grillet (Barco)- DA4.2: Intermediate report of demonstrators designs, status: final ( pdf format)
- DA4.3.1: Demonstrator and final report on performance evaluation for the Car SoC, status: final (pdf format) -->
- DA4.3.2: Demonstrator and final report on performance evaluation for the HomeTV device, status: final (pdf format)
- DA4.3.3: Demonstrator and final report on performance evaluation for the display controller platform, status: final (pdf format)
WPM1: Project Management
Work package leader: Dennis Alders (NXP-NL)- DM1.3a : Progress report, status: final ( pdf format)
WPM2: Dissemination & Interaction with other ARTEMIS projects
Work package leader: Rodrigo Ferreira (ISA)Latest News
1. SCALOPES presented three demonstrators during the ITEA & ARTEMIS Co-summit
on October 26 & 27, 2010, in Ghent, Belgium.
2. Review meeting was held on December 3, 2010, in Brussels, Belgium.
3. General Assembly meeting took place on December 13-14, 2010, in
Prague, Czech Republic.
4.
ARTEMIS Technology Conference 2010 was organized by the
SCALOPES project, June 29-30, 2010, in Budapest,
Hungary.
5. Revised Technical Annex available v2.7
6. M24 public deliverables are available on this WEB site.
7. Final project review on March 29 2011.